The Bridge at The Baulk has been Repaired
Date Added: 30/04/2024
For some time now, the bridge at The Baulk posed a threat to those who traversed it as it was contnuously being vandalised despite temporary repairs. With the potential for accidents looming, Central Bedfordshire Council recognised the urgency of the situation and took decisive action to replace the entire bridge.
Sandy Town Council is pleased because in addition to restoring the physical structure, the well-being and safety of Sandy Residents and all those who ply that route has been safeguarded.